by Troy | Aug 5, 2026 | News
LG Pro Centric Cloud or Direct for an occupied hotel? The deciding difference is where the TV content-management service runs. Cloud moves that management layer off the property; Direct uses an on-site Pro:Centric server. Neither choice, by itself, establishes which...
by Troy | Aug 4, 2026 | News
Quick answer: A hotel cabling project is ready for owner acceptance only when every installed link can be traced from its field label to a native certification result, current drawing, rack and port, correction history, warranty record, and final acceptance owner. A...
by Troy | Aug 3, 2026 | News
Quick answer: A hotel MDF or IDF should be released for cabling only after the current plans, continuous pathways, penetrations, room finishes, racks and backing, power and grounding, environmental conditions, access, and acceptance evidence have been verified. A room...
by Troy | Aug 2, 2026 | News
Quick answer: A hotel low-voltage responsibility matrix should name who designs, provides, installs, powers, configures, tests, accepts, and supports every item in the cabling scope. It should also identify the drawing revision, location, due date, and evidence...
by Troy | Jul 31, 2026 | News
Hotel IT support should not begin with an opening-week outage. Before guests arrive, the owner needs one documented path from a reported symptom to the team that can diagnose the network, Wi-Fi, phones, security, cabling, and any shared infrastructure behind it. A...