Hotel PBX Cutover Checklist: 9 Dependencies Before Go-Live

Hotel PBX Cutover Checklist: 9 Dependencies Before Go-Live

A hotel PBX cutover can look ready because the phones are on-site and the vendor has a date. That is not the same as being ready to go live. The schedule can still depend on number ownership, carrier work, SIP or internet service, E911 location records, analog...
Hotel Technology Site Survey: 12 Decisions Before Work Starts

Hotel Technology Site Survey: 12 Decisions Before Work Starts

A hotel technology site survey should not end with a folder of photos and a vague note that the property is “ready.” It should produce a decision record. Ownership, operations, the general contractor, designers, installers, carriers, and technology vendors...
Hotel Technology Decision Matrix: A Practical Owner Template

Hotel Technology Decision Matrix: A Practical Owner Template

A hotel technology proposal can have the lowest total and still be the most expensive decision. The reason is usually not arithmetic. It is that the proposals are pricing different projects. One may include installation and closeout. Another may exclude freight,...
Optimized by Optimole